- GST is not applicable for foreign-based exhibitors.
- Orders are only considered valid when accompanied by full payment. A confirmation of your order will be sent to the email provided for payment methods.
- Late orders received after 9 OCTOBER 2026, will incur a 30% surcharge.
- On-site orders may not be fulfilled and, if they are, will be subject to a 50% surcharge.
- All quoted prices include local licensing fees, installation (where applicable) and power consumption. For any electrical requirements not listed in this form, please contact the contractor’s email address above for a quote.
- Only the Official Electrical Contractor is authorized to perform electrical work from the power source to the booth.
- All electrical connections to equipment must be tested and approved by the Official Electrical Contractor prior to the turning on of the power supply. The Organiser reserves the right to disconnect power from any installation deemed unsafe or disruptive.
- Exhibition requiring different voltages, frequencies, stabilisers, or special equipment must provide their own transformers, converters, boosters, stabilisers, UPS, etc. and notify the Organiser.
Image | Name | Description | Price | Quantity | Add to cart |
|---|---|---|---|---|---|
| $188.50 | Max: Min: 1 Step: 1 | ||||
| $188.50 | Max: Min: 1 Step: 1 | ||||
| $227.50 | Max: Min: 1 Step: 1 | ||||
| $500.50 | Max: Min: 1 Step: 1 | ||||
| $500.50 | Max: Min: 1 Step: 1 | ||||
| $845.00 | Max: Min: 1 Step: 1 | ||||
| $1,430.00 | Max: Min: 1 Step: 1 |
***Important Note***
Light boxes are charged based on the number of tubes in each light box, the light connection or 40W fluorescent tube rate, whichever is applicable.
If light fittings are provided by the exhibitors, the connection charges for lighting will be based on the number of bulb/tube. In the case where light boxes are pre-installed with light fittings, the official contractor reserves the right to charge connection based on assumption of 5nos. of 1mL fluorescent tubes per meter.
All electrical connection to equipment must be tested and approved by the Organizer’s appointed licensed engineer prior to turning on the power supply. The Organizer reserves the right to terminate the power supply to any installation deemed dangerous or may cause disruption to the power supply.




